Back to Projects
in 2011 we acquired 230 MWe Combined Cycle Power Plant in partnership with Solar Power Netwroks kft and SIA kft. The power plant is established on the basis of the following main equipment:
The building is located on a corner plot facing II. János Pál pápa Square and Kenyérmező Street in District VIII. It’s made up of an existing corner building (to be remodelled on Plot “B”) and a new extension on Plot “A”. The two sides will be connected at the basement level and will function as one building.
The concept design has been approved. Should a permit be granted by October 2018, project completion should be realized by the end of 2020.
The project is owned by Redpro Hungary and Beyond group holds 15% equity.